Manufacturer since 20033,000 m² factory in Shenzhen5 production lines100,000 power supplies / monthOEM & ODM, factory direct

Power supply and battery pack factory in Shenzhen

We design, build and test laptop adapters, USB-C chargers, LED power supplies and lithium battery packs on our own 5 production lines. Factory-direct supply for distributors and brands in Europe and North America since 2003.

3,000 m²factory floor
80employees
5production lines
100,000adapters / month
24 hburn-in per unit
Find a model we make4,360 models
INPUT100–240V ~ 50/60Hz
VA

What our lines build

Two workshops under one roof, sharing the same engineering team, incoming inspection and quality system.

From component to carton, in one building

Nothing is outsourced between the bare board and the export carton. That is how we keep quality and lead times under our own control.

  1. Automated placement head over a printed circuit board

    PCBA production

    Incoming parts are inspected, then boards are assembled and soldered.

  2. Daxpoo power adapter assembly line with operators at ESD workstations

    Line assembly

    Board, enclosure, cable and plug come together at ESD workstations.

  3. Engineers working at test equipment in a quality laboratory

    Test and burn-in

    Every unit is tested, then aged under load for 24 hours.

  4. Warehouse racks loaded with pallets

    QC and packing

    Final inspection, labelling and bulk or retail packing.

  5. Factory building with loading docks

    Shipping

    Loaded at our dock and shipped by air, sea or express.

Tour the factory

How your OEM order moves through the factory

Most private-label projects start from a model already running on our lines. Samples take 3–7 days; bulk orders ship in 15–25 days.

  1. Send your spec

    Output rating, connector, plug type, certifications and quantity go straight to our engineers.

  2. Samples from our lab

    We confirm price and lead time, build samples and ship them for your testing.

  3. Approve the details

    Logo, label artwork, cable length and packaging are signed off before the line starts.

  4. Production and burn-in

    Parts are inspected, units assembled, tested and aged for 24 hours.

  5. Packing and loading

    Bulk or retail packing, loaded at our dock for air, sea or express.

OEM and custom power solutions

Engineers working at test equipment in a quality laboratory
Quality and test lab
CEFCCRoHS

UL, TÜV, CB and other marks can be arranged per project.

Tested in our own lab, not someone else's

12 QC inspectors and an in-house test lab check every order at three points.

  • Incoming sampling of every component batch
  • 20 automatic test stations for output, ripple and protection on every unit
  • 4,000-position burn-in room: 24 hours under load
  • Hi-pot, drop, temperature and humidity testing on site
  • Test reports supplied with your order

Talk to the factory directly

No trading company in between. Send a model number, a photo of your current adapter's label, or a full spec sheet.

info@daxpoo.com
+86 133 9241 5151 (WhatsApp)

Shenzhen, Guangdong, China. Factory visits and video tours on request.

Factory building with loading docks
Loading dock

Request a factory quote

You are writing to the factory, not a reseller. Send the model or spec and quantity; a sales engineer replies within one working day with factory pricing and lead time.

We use your details only to answer this request. Privacy policy

WhatsApp us